Main Navigation

20 Meter Long Lead

20 Meter Long Lead

SKU: AMAZON
£29.99

Product Description

This 20 Meter Long Lead is designed with reflective material for increased visibility and is made with strong, durable materials for long-lasting use. Ideal for long walks or training sessions, this lead provides both safety and convenience for you and your pet.

Why we like it

  • Designed for dogs
  • From the The North East Pet Shop range

Product details

  • Brand: The North East Pet Shop
  • Suitable for: Dogs
  • Product type: Dog Harnesses

Sizing & fit

Check the manufacturer’s sizing guidance before ordering. Adjust for a secure, comfortable fit without restricting normal movement, and inspect straps, fastenings and fittings regularly.

Good to know

  • Measure before ordering where sizing applies
  • Recheck the fit regularly as your pet grows or changes shape
Check in-store availability
Website and Hebburn-store stock levels can differ. If you are making a special trip for a particular item, please WhatsApp us or email us first so we can confirm availability.

We offer Free shipping to UK Mainland addresses, if your address is outside UK Mainland you be contacted to pay an additional fee, we will try to avoid this where possible. Orders outside of the UK are currently not possible to fufill. 

We aim to ship all items with 3 to 5 business days. If you haven't recieved your item within 7 business days then please contact us via sales@itsallaboutpetlovers.co.uk stating your order reference number and we will look to resolve your issue as quickly as possible.

Due to the current COVID-19 situation delivery times maybe longer we trying to limit the impact of this on our business and are continuing as normal as possible taking all the necessary precautions needed. We apologise for any delay you suffer in recieving your order.